Laserfiche WebLink
CAM BRIA <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (510) 420-3336 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> Dan Lescure <br /> Senior Project Engineer <br /> D GEO� <br /> K COpOC�J' <br /> Aubrey K Cool, RG <br /> Project Geologist ® P40 7659 <br /> RG 7659 a- <br /> sr��0r <br /> Attachments <br /> Table 1 Groundwater Extraction—Mass Removal Data <br /> Figure I Site Vicinity/Well Survey Map <br /> Figure 2 Site Plan <br /> Figure 3 Groundwater Contour/Chemical Concentration Map—June 21, 2004 <br /> Figure 4 Monitoring Well MW-4 MTBE and TBA Concentrations versus Time <br /> Figure 5 MTBE and TBA Concentrations versus Time in MW-1, P-1, and P-2 <br /> Appendix A Certified Laboratory Analytical Reports <br /> Appendix B Barometric Pressure versus Time Graph /Pump Test Analysis Reports <br /> Appendix C Study of TBA at Selected UST Remediation Project Sites in Orange County, CA <br /> — Shell Global Solutions,November 14, 2003 <br /> Appendix D Blaine Tech Services, Inc — Second Quarter 2004 Groundwater Monitoring <br /> Report <br /> cc Ms Karen Petryna, Shell Oil Products US, 20945 S Wilmington Ave , Carson, CA 90810 <br /> Mr James Barton, Central Valley Regional Water Quality Control Board, 11020 Sun <br /> Center Drive, #200, Rancho Cordova, CA 95670 <br /> Mr Sukh Singh (Property owner), 2849 Watt Avenue, Sacramento, CA 95821 <br /> 0955 10 <br />