My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2900 - Site Mitigation Program
>
PR0503634
>
ARCHIVED REPORTS XR0009009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 4:53:34 PM
Creation date
5/7/2019 4:42:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009009
RECORD_ID
PR0503634
PE
2950
FACILITY_ID
FA0005914
FACILITY_NAME
VICTOR ROAD SHELL
STREET_NUMBER
880
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905032
CURRENT_STATUS
02
SITE_LOCATION
880 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> C A M B R I A <br /> Proposed Scope of Work <br /> To address migration of dissolved gasoline constituents (primarily methyl tertiary butyl ether <br /> [MTBE]) in groundwater, Cambria proposes to start with a 5-day aquifer pump test This pump <br /> test would use extraction/monitoring well MW-4, proposed in Cambria's June 5, 2002 Site <br /> Investigation Work Plan Cambria also proposes installing two piezometers, which will be used <br /> as observation points during the pump test The extended aquifer pump test will assist in interim <br /> remediation of groundwater beneath the site, determine the hydraulic properties of the aquifer, <br /> and determine if additional remediation is warranted <br /> Cambria's proposed scope of work includes the tasks described below <br /> Work Tasks <br /> Permit: Cambria will obtain an appropriate permit for drilling from SJCEHD <br /> Site Safety Plan: Cambria will prepare a Site Safety Plan for field work <br /> Utility Clearance. Cambria will mark proposed drilling locations and the locations will be <br /> cleared through Underground Service Alert prior to drilling <br /> Piezometer Installation• Cambria proposes installing two piezometers (P-1 and P-2) during the <br /> next site investigation phase to serve as observation points during the aquifer pump test <br /> Piezometer P-1 will be located eight feet north of proposed extraction/monitoring well MW-4, <br /> and piezometer P-2 will be located 16 feet southeast of well MW-4 (Figure 2) <br /> A Cambria geologist will supervise the drilling and describe encountered soil using the Unified <br /> Soil Classification System and Munsell Soil Color Charts Soil samples will be collected at five- <br /> foot intervals for description, possible chemical analyses, and organic vapor screening with a <br /> photo-ionization detector (PID) PID readings will be recording on the boring log for each <br /> piezometer <br /> Soil samples designated for chemical analyses will be retained in stainless steel or brass tubes <br /> The tubes will be covered on both ends with Teflon sheets and plastic end caps Soil samples <br /> will be labeled, entered onto a chain-of-custody record, and placed into a cooler with ice for <br /> 0955 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.