My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2900 - Site Mitigation Program
>
PR0503634
>
ARCHIVED REPORTS XR0009009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 4:53:34 PM
Creation date
5/7/2019 4:42:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009009
RECORD_ID
PR0503634
PE
2950
FACILITY_ID
FA0005914
FACILITY_NAME
VICTOR ROAD SHELL
STREET_NUMBER
880
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905032
CURRENT_STATUS
02
SITE_LOCATION
880 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i • <br /> C A M B R I A <br /> transport to a State of California certified laboratory for analyses A standard two week <br /> turn-around time will be requested for laboratory results <br /> The piezometers will be drilled using hollow-stem auger drilling equipment Each boring will be <br /> drilled to approximately ten feet below first encountered groundwater Based on the quarterly <br /> monitoring results, groundwater is approximately 47 to 50 feet below grade (fbg) The <br /> i <br /> piezometers will be constructed using two-inch Schedule 40 PVC well casing The screen <br /> interval will be approximately five feet above and ten feet below first encountered groundwater <br /> for each well The sandpack will be placed from the bottom of the well up to two feet above the <br /> top of the well screen, followed by a two-foot thick bentonite seal and cement grout to grade <br /> I <br /> Actual well construction details will be based on field conditions and static water levels during <br /> drilling Each well will be secured with a locking cap under a traffic-rated well box <br /> Chemical Analyses: Selected soil samples will be analyzed for TPHg and BTEX by EPA <br /> Method 8015MI8021 or equivalent and fuel oxygenates (MTBE, ethyl tertiary butyl ether, <br /> tertiary butanol, di-isopropyl ether, and tertiary amyl methyl ether)by EPA Method 8260 <br /> • Wellhead Survey Activities: Following piezometer installation, a licensed surveyor will survey <br /> wellhead elevations relative to mean sea level and the well locations relative to latitude and <br /> longitude <br /> Aquifer Pump Test: To conductT5-day <br /> m med tion and determine aquifer hydraulic <br /> characteristics, Cambria propos s quife mp test The test will utilize proposed well <br /> MW-4 as an extraction point Grr will be extracted using a Grundfos model SQE-15 <br /> electric submersible pump The extracted groundwater will be temporarily stored in a 20,000- <br /> gallon Baker tank A liquid-level switch mounted in the Baker tank will be connected to the <br /> groundwater pump to prevent tank overflow Based on the extraction rate, vacuum trucks will be <br /> scheduled to periodically remove water from the Baker tank in order to maintain storage capacity <br /> and continuous extraction The extracted groundwater will be transported to the Martinez <br /> Refining Company in Martinez,California for recycling <br /> Groundwater samples will be collected from the extraction well prior to extraction, each day of <br /> pump test, and at the end of pump test Interim remediation effectiveness will be evaluated by <br /> determining MTBE mass removal, the MTBE concentration trend over the course of the pump <br /> test,and the MTBE concentration trend from subsequent quarterly groundwater sampling events <br /> i <br /> 0955 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.