My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2900 - Site Mitigation Program
>
PR0503634
>
ARCHIVED REPORTS XR0009009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 4:53:34 PM
Creation date
5/7/2019 4:42:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009009
RECORD_ID
PR0503634
PE
2950
FACILITY_ID
FA0005914
FACILITY_NAME
VICTOR ROAD SHELL
STREET_NUMBER
880
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905032
CURRENT_STATUS
02
SITE_LOCATION
880 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> CAMBRIA <br /> i <br /> i <br /> The viability of groundwater extraction will be evaluated by measuring flow rates achieved by <br /> pumping from well MW-4 Step discha will be conducted first to evaluate well <br /> efficiency and determine sustainable yield fora constant-rate test A constant-rate est ill be <br /> conducted to evaluate aquifer hydraulics Groundwater drawdown in the extraction well, <br /> adjacent wells, and proposed piezometers will be measured using MimTroll pressure transducers <br /> Recovery rates in the extraction well will similarly be measured Results from the pump test, <br /> groundwater sampling, and quarterly monitoring results will be used to determine whether <br /> additional groundwater remediation is warranted <br /> Report Preparation. Cambria will prepare an aquifer pump test report which will include field <br /> procedures, laboratory results, boring logs, conclusions, and recommendations <br /> The scope of work described in this work plan will be performed under the supervision of a <br /> registered professional engineer or registered geologist <br /> Schedule <br /> . Upon receiving wntten approval of this work plan and our June 5, 2002 Site Investigation Work <br /> Plan from SJCEHD and appropnate dnllmg permits, Cambna will schedule the well and <br /> piezometer installations Once the proposed extraction well and piezometers are installed, <br /> Cambria will initiate the pump test <br /> • <br /> 0955 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.