Laserfiche WebLink
Page 3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Air compressor and 0-15#Dial Gauge Equipment Resolution: <br /> Piping Run# 1 Piping Run# 2 Piping Run#3 Piping Run#4 <br /> Piping Material: Poly Poly Poly Poly <br /> Piping Manufacturer: OPW OPW Environ Environ <br /> Piping Diameter: 1.5" 1.5" 1.5" 1.5" <br /> Length of Piping Run: 80' 80' 30' 30' <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location of Unable to isolate due Unable to isolate due Test boots at the ends Test boots at the ends <br /> piping-run isolation: to no test boots to no test boots of the piping runs of piping runs <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): 5 psi 5 psi <br /> Test End Time: <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 30 minutes 30 minutes <br /> Change in Reading(RF-R,): No change No change <br /> Pass/Fail Threshold or <br /> Criteria: No change=pass No change=pass <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Piae runs 1 and 2 have no test boots in UDC's and Dine sumps <br /> Site reauires a total of(16) 2.0" X 2 0" split boots <br />