My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
6540
>
2200 - Hazardous Waste Program
>
PR0517751
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 4:28:53 PM
Creation date
5/9/2019 4:14:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0517751
PE
2227
FACILITY_ID
FA0013577
FACILITY_NAME
ITS TECHNOLOGIES & LOGISTICS
STREET_NUMBER
6540
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18109027
CURRENT_STATUS
01
SITE_LOCATION
6540 S AUSTIN RD
P_LOCATION
01
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />b. Data gathered from monitoring equipment, at least <br />once each operating day, to ensure that the tank <br />is being operated according to its design; <br />c. The level of waste in the tank, at least once <br />each operating day, to ensure compliance with <br />item III.C; and <br />d. The construction materials of, and the area <br />immediately surrounding the tank, at least <br />weekly, to detect corrosion or leaking of <br />fixtures or seams. <br />5. In accordance with the written inspection schedule of <br />the approved Operation Plan, the owner or operator <br />shall inspect: <br />a. Recycling process equipment, at least once each <br />operating day, to ensure that it is in good <br />working order; <br />b. Process and operations monitoring equipment, at <br />least once each operating day, to ensure that the <br />recycling process or equipment is being operated <br />according to its design; <br />c. The construction materials of the recycling <br />process or equipment, at least weekly, to detect <br />corrosion or leaking of fixtures or seams; and <br />d. The construction materials of, and the area <br />immediately surrounding discharge confinement <br />structures, at least weekly, to detect obvious <br />signs of leakage. <br />6. The owner or operator shall remedy any deterioration <br />or malfunction of equipment or structures which the <br />inspection identified as soon as possible to ensure <br />that the problem does not lead to an environmental or <br />human health hazard. Where a hazard is imminent or <br />has already occurred, remedial action shall be taken <br />immediately as described in the contingency plan. <br />7. The owner or operator shall record inspections in an <br />inspection log or summary and shall keep these records <br />for at least three years from the date of inspection. <br />K. Personnel Training <br />1. Facility personnel shall successfully complete the <br />program of classroom instruction or on-the-job <br />training which teaches them to perform at a level that <br />ensures the facility's compliance with Chapters 6.5 <br />and 6.7 of Division 20, H&S Code and with Chapter 30, <br />Division 4, Title 22, CCR. <br />-22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.