My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
INSTALL 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:44:00 AM
Creation date
5/10/2019 2:21:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1y� Piping (cross-sectional d, m, including connections to tank and dispe—,rs). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br /> 7 Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)1, or <br /> (B) ✓ Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) A4��'-' Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) AI/ Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet all of the following requirements <br /> Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> installed inside a secondary containment system in the form of: ✓secondary pipe_Vault or <br /> _lined trench to be sloped to a collection sump at the low point of the piping. <br /> Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Automatic line leak detectors will be installed on pressurized piping <br /> Manufacturer: Model: <br /> V// Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> i1 Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. Plan review and operating permit fees paid. <br /> 22. V What is the approximate depth to ground water: 7 r C T <br /> (include source of information - borehole logs, monitoring well data, water <br /> studies, etc.) # <br /> �Ni//4'c>�/n✓If-niTAt 3, 7-6- / i���f�MtnlT— �E[.> ,,-v 7- /nrC i2t0L2T A6 - <br /> C/d TTilc+is�t� <br /> 23. Total number of tanks on site after installation: <br /> 24. /Z County/City Fire District and Building Department notified. <br /> 25. ✓ In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owns pr operator mys/acknowledge this responsibility for workplan submittal by signature and date below. <br /> Name /���/ ___.� - "Z Title r C 'M r7- i4Kcni1 Date Lr417 <br /> CONDITIONS OF APPROVAL: <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.