Laserfiche WebLink
G <br /> Site Address: SS #6313, 1 100 S MAIN STREET. MANTECA Date of Testing/Servicing: / C <br /> F. In-Tank Gauging / SIR Equipment: Check this box if tankgauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Co lete the folloNi�in checklist: <br /> ected for proper entry and termination, including testing for ground faults? <br /> Yes ❑ No* Has all input wiring been insp <br /> S ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑ No* Was accuracy of system product level readings tested? <br /> Yes ❑ No* Was accuracy of system water level readings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> Yes ❑ No* IWere all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Co tete the follo"1119 checklist: <br /> es ❑ No* For equipment start-up or annual equipment c�ification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: C3 3 g.p.h.'; ❑ 0.1 g.p.h.2' ❑ 0.2 g.p.h.` <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> es ❑ No* Was the testing apparatus properly calibrated? <br /> es ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes 2ZIAFor electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ Yes ❑ For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> ❑ Yes ❑ W For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ Yes VIA <br /> For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> es ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: PIF-Pt /}c E p f'7 < < LD - 7nDcp *V)-O5in sem, <br /> 03/01 <br /> Page 3 of 3 <br />