Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 2 of 2 <br /> VI. UNDER DISPENSER CONTAINMENT(UDC)MONITORING (Check all <br /> thatapply) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> L CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> ❑ 4.NO DISPENSERS ❑ 99,OTHER(Specify) 490-54b. <br /> LEAK MONITOR MANUFACTURER: V IEE L- P-TD-T 490-55. MODEL#: TLS -1>S10 490-56 <br /> LEAK SENSOR MANUFACTURER: U E E p£IL - Q ooT 490-57. MODEL#(S): -3,L 3 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. a.YES [1b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 19 a.YES ❑ b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 5(a.YES ❑ b.NO 490-61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. _ Ia.YES ❑_ b.NO 490.62• <br /> UDC CONSTRUCTION IS: JA 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490.64a. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 4v°-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 ccR§260.4.11 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68 <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-6%. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-694. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69£. <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69& <br /> ❑ <br /> OTHER(Specify): 490ago-.691691. <br /> . <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70- <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide addditional �n44�nts re r indicat ow m pages with ditignal infsrmat on specific inonitorin p ocedures�r attled to this plan. 490-71. <br /> rl�ut Mal1C U t M1V� UioOFF WHeNt61v SuS SEND �n� Sl1R�ING Su�v1� �ISPEaSG1eR,ltM1D►�iTOftOJ45yStEN1 fMLs <br /> F IQ 40 <br /> XI. PERSONNEL RFSPCMSTRH,ITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs.2.)all conditions that indicate a possible release are investigated;and 3. all monitoring records are maintained ro rl <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: IA�0;-I f- C 14-hoc, - 490-7. TITLE: (A F A gL 0, 490-73, <br /> NAME: IL U L D-GIFP SH kR rA Ar- 490-74. TITLE: M em 490-75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 1 490-77• <br /> REPRESENTING 1.Tank Owner/ for 0 2.Facility Owner/operator 3.Authorized Reprematme of owner 490-76. 1�� <br /> APPLICANT NAME(print): 490.78. APPLICANT TITLE: 490-79. <br /> `C--ULD C - SH pr(L r�pr M Pr A <br /> UPCF UST-D(12/2007)-3/4 www.unidocs.org <br />