Laserfiche WebLink
3. Piping Leak Detection Monitoring Equipment <br />Monitoring Method <br />Manufacturer <br />Model <br />Monitoring Frequency <br />® Sump leak sensors connected to <br />Continuous <br />continuous monitoring system <br />Veeder Root <br />794380-208 <br />Specify type: <br />❑ Discriminating <br />Continuous <br />® Non -discriminating <br />Veeder Root <br />794380-323 <br />Continuous <br />® Mechanical line leak detectors with <br />Vaporless <br />LD -2000 <br />programmed leak threshold of three <br />Red Jacket <br />FXIV (91 tank only) <br />Every pumping cycle <br />allons per hour <br />El Daily <br />F1Visual inspection <br />❑ Electronic line leak detectors with <br />❑ Other: <br />❑ No under -dispenser containment <br />programmed leak threshold of: <br />Every pumping cycle <br />❑ 0.1 gph ❑0.2 gph 03 gph <br />❑ Line integrity testing by: <br />❑ Electronic line leak detector is <br />equipped to conduct line tightness <br />❑ Annually <br />testing <br />❑ Other: <br />❑ Third party testing <br />® Not required <br />❑ Other (Specify): <br />4. Dispenser Leak Detection Monitorina Eauipment <br />Monitoring Method <br />Manufacturer <br />Model <br />Monitoring Frequency <br />❑ Mechanical float in dispenser <br />Continuous <br />containment <br />® Electronic leak sensor in dispenser <br />containment: <br />Veeder Root <br />794380-323 <br />Continuous <br />❑ Discriminating <br />® Non -discriminating <br />El Daily <br />F1Visual inspection <br />❑ Other: <br />❑ No under -dispenser containment <br />❑ Other (specify): <br />5. Positive snutaown ca aompes <br />❑ System does not have positive shutdown capabilities <br />❑ Individual dispenser shutdown will occur whenever release is sensed in under -dispenser containment <br />® Automatic pump shut off will occur whenever: <br />® Release is sensed in turbine sump <br />❑ Release is sensed in primary piping <br />® Release is sensed at dispenser <br />® Monitoring system is disconnected or fails in any way (fail safe) <br />❑ Other (specify): <br />6. Secondary Containment Testin <br />❑ Secondary containment is not tested <br />® In the State of California, secondary containment systems installed on or after January 1, 2001, shall be tested upon installation, <br />six months after installation, and every 36 months thereafter. Secondary containment systems installed prior to January 1, 2001, <br />shall be tested by January 1 2003 and every 36 months thereafter. <br />7. Annual Equipment CertificationrTesting <br />® Annually <br />❑ Other (specify): <br />2 <br />