Laserfiche WebLink
A <br />Alk <br />SAN JOAQUI COUNTY ENVIRONMENTAL HEALTH DE ARTMENT <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 1 <br />TYPE OF ACTION 1. NEW PLAN❑ 2. CHANGE OF INFORMATION <br />MOL <br />PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />N402 <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I.' FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) r- /> I - 0 - 6 <br />FACILITYNAME MA(N S-Tf-EIE T A4,co AM PM -- I -JS ENTeI-VP4it LLC. <br />rlm. <br />FACILITY SITE ADDRESS U00 D S• MAIN ST(ZEE T M04. <br />CITY YAA-N7E Com, CA 95 33 -1 <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be perrorrned in <br />M06. <br />accordance with the equipment manufacturers' instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED I. ANNUALLY ❑ 99. OTHER (Specify): <br />M°7. <br />III. MONITORING. LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, <br />line leak detector, monitoring system control panel, etc.). If you already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification <br />form, Hazardous Materials Business Plan map, etc.) which shows all required information, include it with this plan. <br />IV. TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />MM <br />❑ 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT IS: X a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />MI I. <br />PANEL MANUFACTURER: MIz MODEL #: <br />MI3. <br />LEAK SENSOR MANUFACTURER: VF -EDF -9, (LOO? MI4. MODEL #(S): <br />MI5. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: MI6. MODEL#: <br />MI7. <br />IN -TANK PROBE MANUFACTURER: MODEL M A Cl MIB. MODEL #(S): M Ar 61 <br />M19. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M20. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): M21. <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): M22. <br />M23. <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />M24. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M25. <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): M26. <br />M27. <br />❑ 6. VISUAL MONITORING DONE: �a DAILY ❑ b. WEEKLY (Requires agency approval) <br />❑ 99. OTHER (Specify): <br />M2 a. <br />V. ;PIPE MONITORING, >. <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />Mao. <br />1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)PfRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />M" - <br />PANEL MANUFACTURER: M32 MODEL #: -1 i M 39. O ^ 10 <br />M33. <br />LEAK SENSOR MANUFACTURER: Vee DEI, (LOOT M34. MODEL #(S): 'T L S. 3 S O <br />M35. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? ❑ a. YES ❑ b. NO <br />M36. <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b_ NO <br />M37. <br />2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED <br />MLLD MANUFACTURER(s) VAPOIi,LE5-4 R,ED J A CM -C r M38. MODEL #(S): ' 1- 1 D �1C 1 V <br />Mia. <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />ELLD MANUFACTURER: M40. MODEL #: <br />M41. <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0. l g.p.h. <br />M42. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M43. <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M44. <br />❑ 4. IN FEGRITY TESTING <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) M45. <br />M46. ' <br />❑ 5.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY* ❑ c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED** <br />M47. <br />* Requires agency approval ** Allowed for monitoring of unburied emergency generator fuel piping only per HSC 125281.5(b)(3) <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ 99. OTHER (Specify) <br />M48. <br />SJCEHD-d (07/03) - 1/4 <br />07/23/03 <br />