Laserfiche WebLink
A May 02 12 01:28p Reliable PetroleumA 209-845-8953 p.3 <br /> Monitoring System Cert' (cation <br /> D. Results of Testin Servicing <br /> Software Version Installed: 331.00 <br /> Complete the folio win c eeklist: <br /> ® Yes ❑ No` Is de audible alarm operational? <br /> ® Yes ❑ No" Is tHe visual alarm operational? <br /> ® Yes ❑ No" Were all sensors visually inspected, functionally tested,and confirmed operational? , <br /> ® Yes ❑ No* Wee a)1 sensors installed at lowest point of secondary con:aiAment and positioned so that cher equipment will . <br /> not nterfere with their proper operation? <br /> ❑ Yes ❑ Na* :f larms are relayed to a remote monitoring station, is all communications equip ent (e.g., modern) <br /> ® N!A ope tonal? <br /> ® Yes ❑ No= For pressurized piping systems, does the turbine automatically shut doom if the piping so endary containment <br /> p -WA mo itoring system detects a leak,tails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> i pos five shut-down? (Check all rha!appy) 0 Sump;Trench Sensors; ®Dispenser Cc-tla :riment Sensors. <br /> Did you confirm positive shut-down due to leaks acid sensor Fail um'discormection! IR Yes ❑No. <br /> ® Yes ❑ No* For rank systems that utilize the monitoring system as the primary tank overfill war i.ng device (i.e., no <br /> j [D h,1/A me znical overfill prevention valve is installed), is the cverfill warnine alarm, visib'e ano i audible at the tank <br /> fill int(s)and operating preperly? If se,at wha'.percent of tank capacity does the alarm T igger? 90% <br /> ® Yes* ❑ No W any tnonito.ing equipment placed? If yes,identify specific sensors,probes, orcthe equipment replaced <br /> and list the ntanufacturrr name and model for all replacement parts in Section E,below. <br /> p Yes' ® No Wa [;quid found inside any seeondary containment systems designed as cry systems? (Ch ck all that apply) <br /> ❑ 1 rcc-act; ❑ Water. If yes.dcscribe causes in Section E.below. <br /> ® Yes ❑ No* W monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if pplicable <br /> ® Yes ❑ Na- [s I monitoring equipment operational per rnanufacturer's specifications? <br /> `In Seetioo E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Replaced sensor in the 89 STP sump (794380-323, se-ial#x 261509) <br /> Page 2 of 4 <br />