Laserfiche WebLink
May G2 12 01:29p Reliable PetroleumA 209-845-8953 p.4 <br /> Monitoring System Ct rtification <br /> F. In-Tank Gaugi N9 I SIR Equipment: <br /> ® Check chis box if tank gauging is used onlyr inventory control• <br /> 11 Check this box if no tank gauging or St.eq ipmernt is installed. <br /> This section must b completed if in-tank gauging equipment is used to perfotrxi leak detectio motuiori <br /> Complete the followingthecklist: n$ <br /> ❑ Yes � p No* Ha 4 input wi-irrg been inspected for proper entre and terminatio::, including testing for ound faults? <br /> ❑ ❑ No' We e all lank gauging probes visually inspected for damage and-esidue buildup? <br /> Yes ❑ I- accuracy of system product level readings tested? <br /> 0 Yes ❑ No* tela accuracy of system water levei readings tested? <br /> ❑ Yes ❑ No* We al]prones reinstalled properly? <br /> C Yes Q No' We Lf ilems on the equipmern manufacturer's rnaintenance checklist completed? <br /> * In the Section H,belo , describe how and when these det]siencies were or will be corrected. <br /> G. Line Leak Dete ors (LLD)-. p Check this box if LLDs are not instal;ed. <br /> Com lete the followio ecklist: <br /> ® Yes For equipment start-up or annual equipment certification was a leafs simulated tc teri LLD performance^ <br /> ❑ N,,A (Che k ad!that apply) Simulated.leak rate: g1; h, > <br /> g p• , Q 0.1 9-P-13; ❑0.2 g.p h. <br /> ® Yes ❑ No* Werc all LLD&confirtned opemtiona;and accurate within reguJatw3•requirements? <br /> ® yes ❑ No* Was e'esting apparatus properly calibrated? <br /> S Yes ❑ No* , For mechanical LLDs, sloes the LLD restrict product tloAN.if it detects a leak? <br /> ElV/A <br /> ❑ Yes ❑ No" For e ect-anic LLDs,does zne nrrbine automatically sl•,ut off if the LLD detects a jeak? <br /> 0 VA <br /> ❑ Yes C No* Fol a crrunic LLDs,does the turbine automatically-shut off if any pardon of the tr►unitori system is disabled <br /> ® N/A Or dis onnected? <br /> Q Yes ❑ No' For C ectroni- LLDs, does the turbine autornaticaliy shut off if an <br /> f,N/A malfu ctions or fails a test? y portion of the monitorittc system <br /> ❑ yes ❑ No* For el ctronic LLDs,gave all accessible wiring conneerons been visually inspected? <br /> NiA <br /> ]1 items on the equipment manufacturer's ma:ntenaece cheskLst completed? <br /> In the Section H,below, ecrribe <br /> now and when these deficiencies were or will be corrected. <br /> H. Comments: <br />