Laserfiche WebLink
May 02 12 01:29p Reliable PetroleumA 209-845-8953 p.5 <br /> "Onitoring System CertMeation <br /> UST Monitoring Site Plan <br /> Site address: � O Ild!� S• AQ.'�.r Sf. � �•9 S 33 � <br /> pie <br /> alp <br /> Gate map was ftwr:� <br /> Instructions <br /> fl You already have a diq m that shovis ak regtimai information,you may include it, rather han 1hs page, with your Mt nitoring system <br /> C00cabon. on your sael Ian,show the general layout el tanks and piping. Clearly Jderttify locations of the following equip ent,if installed: <br /> ""itadng system control 33nels. sensors snonibring tank annular spaces, sumps, dispenser We, spill containers, or Jther secortoary <br /> =ffftnment areas; mecha 4cal or alectronic line leak detectors: ald imtank liquid level probes (f used ar leak detection In the space <br /> @r+mWed, note the date this ite Plan es pr <br /> wepared. <br /> Mtonitoriny Syatem Ceratk an <br /> Pa4e 4 of 4 72IQ7 <br /> 4 2/21/07 <br />