Laserfiche WebLink
FXI, Inc. — Lathrop, CA <br /> Periodic Testing of the Integrity of Aboveground Tanks <br /> 40 CFR 112.8(c)(6) <br /> The systems are inspected monthly for leaks, stains and spills of#2 Diesel as required by <br /> the SPCC Plan and CFR 40 112.7. Inspections are performed by trained staff and done to Industry <br /> Standards. Testing of the tanks was performed by a Certified SP001 Inspector on May 17. 2017. <br /> The monthly inspections are recorded on page 33. <br /> Leakage from Internal Heating Coils <br /> 40 CFR 112.8(c)(7) <br /> There are no internal heating coils within this system. The applicable requirements of 40 <br /> CFR 112.8(c)(7) do not apply to this facility or SPCC Plan. <br /> Engineer or Update Containers to Avoid Discharge 40 CFR 112.8(c)(8) <br /> FXI, Inc. uses a visual tank gauge system consisting of a tank gauge that indicates the <br /> tank's volume in feet and inches. When the driver arrives on site and prior to unloading any oil <br /> product, they will verify tank space and insure that the oil product to be delivered will fit. The#2 <br /> Diesel fuel storage tank is equipped with a monitoring port system.If the driver is alerted of danger <br /> or overfill during delivery, the driver will cease all loading and secure the system. <br /> Observe Effluent Discharge 40 CFR 112.8(c)(9) <br /> FXI,Inc. does not employ a surface water effluent or water separation treatment system at <br /> this site. The requirements in 40 CRR 112.8(c)(9) are not applicable. <br /> Promptly Address Visible Discharge 40 CFR 112.8(c)(10) <br /> This is addressed within this Plan at 40 CFR I I2.7(e). <br /> Mobile or Portable Oil Storage Containers 40 CFR 112.8(c)(11) <br /> FXI, Inc. has no mobile and/or portable oil storage containers within their oil product <br /> management system.. <br /> Facility Transfer Operations 40 CFR 112.8(4)(1),(2),(3),(4), & (5) <br /> These items are addressed in 40 CFR 112.7(a)(3)(iii). <br /> .. 29 <br />