Laserfiche WebLink
Sent By: RHL DESIGN GROUP; 7077659908; Apr-20 ^4 10:48AM; Page 16/17 <br /> Date: Ann116, 2004 <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br /> conditions of the operating pemilt. The permit holder must notify San Joaquin Counry Public Health Services within 30 days of any <br /> changes to the monitoring procedures,unless required to obtain approval before making the change. <br /> Required by Sections 2632(d)and 2641(h)CCR. <br /> Facility Name Safeway Store#2707 <br /> Facility Address 6425 N. Pacific Ave. Stockton <br /> A. Describe the frequency of performing the monitoring: <br /> Tank Continuous electronic monitoring. <br /> Piping Continuous electronic monitoring. <br /> B. What methods and equipment, identified by name and model, will be used for performing <br /> the monitoring: <br /> Tank: Double wall interstitial monitoring sensors. model #794390-460 via Veeder Root <br /> TLS-35OR system. model #848290-012. GPH magnetostrictive in-tank volumetric probe <br /> Model#847390-109 <br /> Piping:Veeder Root TLS-350 with discriminating sensors in the fill sump and nixing sump, <br /> model 9794380-352. and discriminating sensors under each dispenser.model#794380-322 <br /> Positive shut down of the turbines.Electronic Line leak detectors model#848480-001. <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan should <br /> be attached): <br /> The monitor alarm panel is located in the Inside Kiosk <br /> D. List the name(s) and title(s)of the people responsible for performing the monitoring and/or <br /> maintaining the equipment. <br /> Stan Olea/Fuel Operations Manager <br /> Heather Moon/Food Safety&Environmental Compliance <br /> Tanknology/Compliance Management <br /> E. Reporting Format for monitoring: <br /> Tank: A written monitoring log. <br /> Piping:A written monitoring log and annual certification <br /> F. Describe the preventative maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months. <br /> The monitoring systems shall be certified annually in accordance with manufacturer's <br /> recommendations. System set-up must be checked to verify that the 99% operating mode <br /> option has been selected. <br /> G. Describe the training necessary for the operation of UST system, including piping, and the <br /> monitoring equipment: The operators receive initial and annual refresher training in <br /> accordance to the manufacturers recommendations <br />