Laserfiche WebLink
RPR-30-2007 10:00 Service Station Systems 408 938 8888 P.04 <br /> Monitoring System Certification-1 2 of 3 <br /> Site Address: 6445 N.Pacific Ave.@ Central CG Date of Testiug/Servicing: 4/9107 <br /> D. Results of Testing/Servicing <br /> Software Version Installed- 324.01 <br /> Com tete the followins checklist: <br /> R Yes 0 No* Is the audible alarm operational? <br /> R Yes 0 No* Is the visual alarm operational? <br /> is Yes 0 No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> a Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interferewith their ro r operation'? <br /> l f Yes 0 No* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g.modem) <br /> 11 N/A Operational? <br /> D Yes 0 No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> D N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) 18 SumpMench Sensors; lE Dispenser Containment Sensors. <br /> Aid you confirm positive shut-down due to leaks and sensor failure/disconnection? Q Yes ❑ No <br /> lE Yes 0 No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no <br /> 0 N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> Pas <br /> oint(s)and operatingpro rly? Tf so, at what erccnt of tank capacity does the alarm trigger? 90 % <br /> EX Yes* D No Was any monitoring equipment replaced?If yes, identify specific sensors, probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement arts n Sect on E,below. <br /> tE Yes* Cl No Was liquid found inside any secondary containment systems= as s stems? <br /> dry y (Check all that apply) <br /> 0 Product;t8 Water. If yes,describe causes in Section E,below. <br /> e Yes 0 No* Was monitor' stem set-up reviewed to ensure proper sett' s? Attach set-upreports, i applicable.) <br /> •Yes a No; Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Replaced Syphon Jets 91,87-1,87-2 <br /> 91 &Diesel are Split Tanks and Share Annular. <br /> Pumped water from Reg STP and Diesel Fill sump. <br />