My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2004 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 3:05:27 PM
Creation date
5/15/2019 2:09:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2008
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY-19-2005 20:01 Service Station Systems <br />Monitoring System Certification -I 3 of 3 <br />Site Address: 6425 N. Pacific Ave. @ Central Ct. <br />F. In - Tank Gauging / SIR Equipment: <br />Date of Testing/Servicing: 4/19/05 <br />® Check this box if tank gauging is used only for inventory control. <br />0 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />ramnlete the followim, checklist: <br />0 Yes <br />I 0 No* <br />I Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />0 Yes <br />0 No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />0 Yes <br />0 No* <br />Was accuracy of system product level readings tested? <br />0 Yes <br />0 NO <br />Was accuracy of system water level readings tested? <br />0 Yes <br />0 No* <br />Were all probes reinstalled properly? <br />0 Yes <br />0 No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): Q Check this box if LLD's are not installed. <br />f nimnlate the fallnwine rherklistc <br />W Yes <br />u No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />t] N/A <br />(Check all that apply) Simulated leak Marc: el 3 g.p.h. (1.); 0 0.1 g.p.h. (2.); 0 0.2 g.p.h. (2J. <br />Notes: 1. Required for equipment start-up certification and annual cenification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />0 Yes <br />N No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />®Yes <br />0 No* <br />Was the testing apparatus properly calibrated? <br />0 Yes <br />0 No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />0 N/A <br />• Yes <br />0 NO <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />0 N/A <br />• Yes <br />0 No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />EI N/A <br />or disconnected? <br />® Yes <br />17 No* <br />For electronic LLD's. does the turbine automatically shut off if any portion of the monitoring system <br />Cl N/A <br />malfunctions or fails a test? <br />® Yes <br />0 No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />m Yes <br />0 No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: Regular turbine would not do a test do a 3gph initially. <br />Regular has 2 FE Petro turbine in the same sump. <br />Repaired both turbines. Retest - Pass, now operational. <br />
The URL can be used to link to this page
Your browser does not support the video tag.