Laserfiche WebLink
MAY-16-2008 18: 11 Service Station Systems 408 938 8888 P.04 <br /> 4. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑Pressure ❑vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Incon Sump Tester Equipment Resolution: +/-0.0021+ <br /> STP Sump#87 STP Sump#91 STP Sump#DSL <br /> Sump Diameter: 49" 50" 511" <br /> Sump Depth: 84" 84" 82" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 91, 10>+ 13" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 43„ 36" 42" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good Good <br /> Portion of Sump Tested' 2"above piping 2"above piping 2"above piping <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes Cl No ®NA ❑ Yes❑No ®NA ❑Yes❑No ONA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A <br /> Is system programmed for fail-safe <br /> shutdown? ❑Yes❑ No ®NA ❑Yes❑No ®NA ❑Yes ❑No ONA <br /> Was fail-safe verified to be <br /> operatic, P, ❑ Yes Cl No ®NA ❑Yes❑No ®NA ❑ Yes ❑No ®NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 4:25 pm 1:12 pm 2:42 pm <br /> Initial Reading(R,): 5.4197 6.7933 3.8376 <br /> Test End Time: 4:40 pm 1:27 pm 2:57 pm <br /> Final Reading(RF): 4.9766 6.7938 3.8387 <br /> Test Duration: 15 min. 15 min. 15 min. <br /> Change in Reading(R1:-R,): -0.4431 +0.0005 +0.0011 <br /> Pass/Fail Threshold or Criteria: +/.0.002" +/-0.002" 4-0.0021, <br /> Test Result: Pass EDFail ® Pass Fail ®Pass Fail <br /> Was sensor removed for testing? ®Yes❑No ❑NA ®Yes❑No ❑NA ®Yes❑No Cl NA <br /> Was sensor properly replaced and ®Yes El No ❑NA ®Yes❑No ❑NA ®Yes❑No Q NA <br /> verified functional after testing'? <br /> Comments—(include information on repairs made prior ro testing, and recommended follow-up.tbr ailed tests) <br /> "Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br /> 91 and DSL STP sumps—replaced both product penetration boots in each sump(4 total)-passed <br /> 87 STP sump—replaced(1)product penetration boot,passed test on 4/15/08 —failed with inspector on 4/17/08.Found <br /> Leaking hole in other penetration,needs to be replaced will need to remove ATG riser for repair. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any.of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />