My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2004 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 3:05:27 PM
Creation date
5/15/2019 2:09:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2008
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY-16-2008 19:11 Service Station Systems 408 938 8888 P.05 <br /> 5. SPILUOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes El <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> Vapor Spill Box#87 Fill Spill Box#91 <br /> Bucket Diameter: <br /> Bucket Depth: 14" 14" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min, 10 min, <br /> starting test: <br /> Test Start Time: 4:25 pm 2:26 pm <br /> Initial Reading(Ri): 5.9471 63741 <br /> Test End Time: 4:40 pm 2:41 pm <br /> Final Reading(RF): 5.9435 6.1451 <br /> Test Duration: 15 min. 15 min. <br /> Change in Reading(RF-R): -0.0036 -0.2290 <br /> Pass/Fail Threshold or +/-0.002" +/-0.002" <br /> Criteria <br /> Test Result: Pass O Fail Pass ©Fail <br /> COMMentS—(include In ornwrion on repairs made prior to tesnn , and reconemended follow-up forfailed tests) <br /> Repaired 91 fill bucket with new compression gasket.Repaired 87 vapor bucket with new vapor adaptor gasket, <br /> Inspector had us fill buckets to grade (apex. 7 gallons)on 4/17/08—both failed <br /> TOTAL P.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.