Laserfiche WebLink
MAY-07-2008 12:37 Service Station Systems 408 938 8888 P.07 <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> 6425 N. Pacific Ave. (21) Central Ct. in Stockton <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> �7r��f�/A.r��. <br /> . . .9.l . .. . . <br /> . ��� . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . <br /> . . . . . . <br /> . : I <br /> Date map was draw, 0 <br /> Instruction$ <br /> on your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if <br /> installed: monitoring system control panels;sensors monitoring tank annular spaces, sumps,dispenser pans,spill <br /> containers, or other secondary containment areas; mechanical or electronic line leak detedtors; and in-lank liquid <br /> level probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> TOTAL P.07 <br />