My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blueline Technologies Page 1 of 4 <br /> QUICK LINKS.. Select Product Category ®I <br /> Select Literature Category <br /> !Wueline Technologies <br /> MEMBER <br /> An HIM HoldiW.LLC Company • , <br /> .SPLIT. REPAIR . FITTINGS <br /> ..SB SERIES PELLETHANE SPLIT REPAIR BOOTS <br /> SB Series Pellethane Split Repair Boots <br /> FEATURES&BENEFITS <br /> • Make all repairs from inside the sump.No need to break <br /> concrete,excavate back fill or break pipe or conduit. <br /> i <br /> • Repair fittings around existing or new pipe and works <br /> on flat orcurved sumps <br /> • Test immediately after the repair is done <br /> • Extensive range of boot and insert sizes to accommodate <br /> all pipe OD's and fitdng styles <br /> • Durable UL Listed Pellethane Construction <br /> • Repair boots are filled with sealant through a fill port to • <br /> stop leaks and stabilize the repair <br /> PRODUCT INFORMATION SHEET SB SERIES PART NUMBERS 6 PRICING <br /> Encapsulation Installation Instructions Replacement Installation Instructions Electrical Replacement Instructions <br /> ..SBTCI SPLIT REPAIR BOOTS FOR TOTAL CONTAINMENT FITTINGS <br /> SBTCI Split Repair Boots for Total Containment Fittings <br /> http://blue-linetechnologies.com/Products_Split_Repair.html 3/24/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.