My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blueline Technologies Page 2 of 4 <br /> FEATURES&BENEFITS <br /> • <br /> Unique threaded fittings for repairaf all TCl applications <br /> • Attachesto existing bulkhead to avoid clearance issues. <br /> • Low profile design leaves room for secondary test boot <br /> Boot are split and are available with or without air test <br /> PRODUCT INFORMATION SHEET INSTALLATION INSTRUCTIONS SBTCI PART NUMBERS&PRICING <br /> ..SBTCIF SPLIT REPAIR BOOTS FOR TOTAL CONTAINMENT FITTINGS <br /> SBTCI Split Repair Boots with Fill Tube for Total Containment Fittings <br /> FEATURES&BENEFITS <br /> • Unique threaded fittings for repair of all TO applicatio <br /> • Attaches to existing bulkhead to avoid clearance issues. <br /> • Low profile design leaves room for secondary test boot <br /> • Boot are filled for added security <br /> • Boobs are split for installation after re-pipe <br /> PRODUCT INFORMATION SHEET INSTALLATION INSTRUCTIONS SBTCIF PART NUMBERS&PRICING <br /> ..TCI NON-SPLIT REPAIR BOOTS FOR TOTAL CONTAINMENT FITTINGS <br /> TCI Non-Split Repair Boots for Total Containment Fittings <br /> FEATURES&BENEFITS <br /> • Unique threaded fittings for repairofall TO applications <br /> • Attaches to existing bulkhead to avoid clearance issues. <br /> • Low profile design leaves room for secondary test boot <br /> • Boots are non-split and are available with or without airtest <br /> PRODUCT INFORMATION SHEET INSTALLATION INSTRUCTIONS TCI PART NUMBERS&PRICING <br /> ..TCIF NON-SPLIT REPAIR BOOTS FOR TOTAL CONTAINMENT FITTINGS <br /> TGIF Non-Split Repair Boots with Fill Tube for Total Containment Fittings <br /> http://blue-linctecluiologies.com/Products_Split_Repaii-.Iitml 3/24/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.