My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: Series Pellethane Splitt BOOtS Instillation Instructions <br /> For Replacement Repairs) <br /> STEP 6 Apply a bead of Blue Seal Glue along the gasket rim and install <br /> the boot onto the seal. Install boot with fill tube at the 12:00 <br /> position.Install band clamp to secure the boot to the gasket. 41 <br /> STEP 7 Position the insert into the boot if applicable,but do not tighten <br /> the clamp.This connection must remain loose through the filling <br /> stage to allow air to escape. <br /> i'. <br /> n <br /> STEP 8 Fill the boot with either Parasealant 626, or Bosdk I IOOFS <br /> through the fill tube with the Blueline pneumatic dispensing gun <br /> until the entire cavity is full. This will ensure that the sealant <br /> pushes back through the leak point and stops the leak. <br /> STEP 9 Once the boot is full, tighten clamps and allow sealant to fully <br /> cure. <br /> BLUELINE TECHNOLOGIES 2001 ■ 310-3846 <br />
The URL can be used to link to this page
Your browser does not support the video tag.