My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SB Series Pellethane Split Repair Boots installation Instructions <br /> I,or Replacement Repairs) <br /> STEP 1 Identify the damaged boot and select the proper Blueline Repair <br /> Boot based upon the number of studs and the pipe OD. (See 2006 <br /> Catalog,Section 10 and Appendix 1) <br /> m® <br /> STEP 2 Remove band clamps from old fitting. Remove the nuts from the <br /> scuds and store for future use.Remove old fitting. The old fitting <br /> u ill need to be cut off. Take care not to damage the secondary <br /> pipe <br /> m <br /> STEP 3 Install all Pellethane split components onto the pipe carefully. All <br /> Pellethane pieces must be rebonded back together with Blue Seal <br /> Glue.This is done by ensuring that the surfaces are clean and dry. <br /> Apply a liberal bead of Blue Seal and hold the scam closed <br /> securely until it is fused. It's helpful to use the clamps to loosely <br /> hold the boot closed during curing. Bonded connections should <br /> hold themselves closed within five minutes if there are no stresses <br /> on them.The Blue Seal glue will be fully cured in 40 minutes. <br /> STEP 4 Once all components are bonded, apply a liberal bead of either <br /> Parasealant 626, or Bostik 1100FS to the underside of the seal. <br /> This will make the seal with the sump wall. Insert poly ring into <br /> the gasket and position it onto the studs and up against the sump ° <br /> wall. <br /> k7 <br /> STEP 5 Reinstall nuts and tighten them in a star pattern. <br /> 4 <br /> BLUELINE <br /> • • 2001 • [8661310-3848 <br />
The URL can be used to link to this page
Your browser does not support the video tag.