My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR-23-2010 09:53 Service Station Systems 408 938 8888 P.04i11 <br /> 4, TANK ANNULAR TESTING. <br /> Test Method Developed By: ❑Tank Manufacturer 0 Industry Standard ❑ Professional Engineer , <br /> ❑ Other(Spec) <br /> Test Method Used: ❑Pressure 0 Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Test plugs,venturi pump and gaugesi Equipment Resolution: 0.5% of span <br /> , M1; <br /> Tank#87 Tank# 91/Diesel <br /> i, <br /> Is Tank Exempt From Testing?' ❑Yes 0 No ❑Ycs 0 No <br /> Tank Capacity: l0k 20k <br /> Tank Material: Steel Steel <br /> Tank Manufacturer: Modern welding Modem welding <br /> Product Stored: Gasoline Gasoline/Diesel <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min. 10 min. <br /> start test: <br /> Test Start Time: 9:30 am 10:45 am <br /> Initial Reading(Rj): 7"hg 7"hg <br /> Test End Time: 10:30 am 11:45 am <br /> Final Reading(RF): 7"hg 7"hg <br /> Test Duration: 1 hour 1 hour <br /> Change in Reading(Rr-Ri): None None <br /> Pass/Fail Threshold or Criteria: No detectable loss No detectable loss <br /> Test Result: E Pass 0 Fail E Pass ❑Fail <br /> Was sensor removed for testing? 0 Yes❑No Cl NA 0 Yes❑No❑NA <br /> Was sensor properly replaced and ®Yes❑No❑NA MYes ❑No❑NA <br /> verified functional after testin <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for foiled tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br /> testing. {Califomia Code of Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.