Laserfiche WebLink
MAR-23-2010 09:53 Service Station Systems 408 938 8888 P.05/11 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(.Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Speedy) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5% of span <br /> Piping Run#87—A Piping Run#87- B Piping Run#91 —A Piping Run#91—B <br /> Piping Material: Plastic Plastic Plastic Plastic <br /> Piping Manufacturer: Western Fiberglass Western Fiberglass Western fiberglass Western Fiberglass <br /> Piping Diameter: 2" 2" 2" 2" <br /> Length of Piping Run: 100, 100, 100, 100, <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location of Reducer BoutsiFittings Reducer Boon/Fittings Reducer BooniFittings Reducer Roots/Fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes <br /> starting test: ....- <br /> Test Start Time: 1030 am 10:30 am 10:30 am 10:30 am <br /> Initial Reading(Rt): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 11:30 am 11:30 am 11:30 am 11:30 am <br /> Final Reading(RF); 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: I hr. 1 hr, I hr. 1 hr. <br /> Change in Reading(RF-Rt): none None None None <br /> Pass/Fail Threshold or No detectable Loss No detectable Loss No detectable Loss No detectable Loss <br /> Criteria: <br /> Test Result: 0 Pass ❑Fail El Pass ❑Fail M Pass ❑Fail 0 Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for foiled tests) <br />