My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR-23-2010 0954 Service Station Systems 408 938 8888 P.07/11 <br /> 7. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer M Industry Standard ❑ Professional Engineer <br /> ❑ other(Specify) <br /> Test Method Used: M Pressure ❑ Vacuum Cl Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5%of span <br /> Piping Runk diesel Vent <br /> Piping Material: Plastic <br /> Piping Manufacturer: Western Fiberglass <br /> Piping Diameter: Z" <br /> Length of Piping Run: low <br /> Product Stored: N/A <br /> Method and location of Reducer[toots/Fittings <br /> iin -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes <br /> starting test: <br /> Test Start Time: 10:30 am <br /> initial Reading(RI): 5 psi <br /> Test End Time: 11:30 am <br /> Final Reading(RF): 5 psi <br /> Test Duration: I hr. <br /> Change in Reading(RF-R,): none <br /> Pass/Fail Threshold or No detectable Loss <br /> Criteria: <br /> Test Result: O Pass C]Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.