My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT ` AOR MORE INFORMATION! <br />¢rn 5555 Skylone Blvd., SL A / Santa Rosa, CA 95403 <br />�r Ph: (800) 688-3375 / Fx: (800) 700-1188 <br />www.westernfg.com <br />MEASURING PIPE RUNS: <br />Co -Flex piping is available in 250', 500' or 1000' lengths. It may be ordered <br />by the foot if required. Do not drag Co -Flex along the ground, step on or <br />place heavy objects on top of the pipe. Cold weather will affect the <br />flexibility. Leaving the pipe coils in the sun prior to installation will make <br />them more pliable and easier to handle. In extreme cold weather, store <br />the piping indoors, at room temperature before measuring and cutting. A <br />personal type hair dryer can be inserted into one end of the pipe coil to <br />warm up and relax the pipe. Cut and discard the first 12" (300mm) of pipe <br />where any heating device has been attached. This section may be <br />damaged by heat exposure. <br />The Co -Flex termination fittings are 5" in length. 2" of pipe is inserted within <br />the termination. An additional 3" is added to the total pipe length at <br />each end of each pipe run by the installation of the terminations. For <br />example, if the required pipe length between the internal or "T" <br />connections inside two separated dispenser boxes is a total of 32' 9", you <br />must subtract 6" to account for the terminations at each end of the pipe <br />length. This pipe length will now be 32' 3" before termination. <br />When measuring pipe lengths, use a pre -stretched line or flat tape to <br />calculate the distance between connection points. <br />Be certain to account for all sweeps and additional pipe lengths required <br />within containment sumps for all connections before cutting. <br />Co -Flex piping may be installed "lazy" within the piping trench. It does not <br />have to be stretched straight or tight and can be routed to <br />accommodate any pipe run requirements. It is important to maintain <br />proper fall or slope. <br />Piping lengths can be cut and terminated outside of the piping trench for <br />ease of installation. <br />Piping lengths may be pre-cut and terminated off-site. <br />CUTTING AND TERMINATION: <br />Co -Flex piping may be cut with any clean, sharp instrument. Be certain to <br />make all cuts square and even. <br />1). Cut Co -Flex pipe to proper lengths. <br />
The URL can be used to link to this page
Your browser does not support the video tag.