My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTAC"'S FOR MORE INFORMATION! <br />5555 Skylane Blvd., e A / Santa Rosa, CA 95403 <br />Ph: (800) 688-3375 / Fx: (800) 700-1188 <br />www.westemfg.com <br />PLEASE NOTE: Slip Test/Crossover boot over pipe ends prior to installation <br />of pipe terminations. <br />2" <br />CV <br />GRAY PRIMARY PIPE <br />2). Strip off final 2" (50mm) of outer containment jacket and remove. This <br />can be done with a razor knife. Be careful not to cut primary pipe outer <br />jacket. <br />FOR SWAGE FITTINGS: <br />3). The swaging machine may be manual, electric or pneumatic (See <br />product data). The procedure for preparation of the pipe end is the same <br />for all types. <br />4). Attach proper guide block to swage ram unit. (Not used with female <br />fittings.) <br />5). Insert draw bar through ram unit. <br />6). Carefully oil or grease the inside of the piping termination. <br />7). Insert pipe termination thread first into guide block on ram unit. <br />8). Screw swage mandrel onto draw bar and firmly against and partly <br />within the pipe termination. <br />9). Grease or oil swage mandrel to insure a smooth swage draw cycle. <br />10). Slide termination swage sleeve (silver) over termination. <br />Page 9 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.