Laserfiche WebLink
CONTAC"'S FOR MORE INFORMATION! <br />5555 Skylane Blvd., e A / Santa Rosa, CA 95403 <br />Ph: (800) 688-3375 / Fx: (800) 700-1188 <br />www.westemfg.com <br />PLEASE NOTE: Slip Test/Crossover boot over pipe ends prior to installation <br />of pipe terminations. <br />2" <br />CV <br />GRAY PRIMARY PIPE <br />2). Strip off final 2" (50mm) of outer containment jacket and remove. This <br />can be done with a razor knife. Be careful not to cut primary pipe outer <br />jacket. <br />FOR SWAGE FITTINGS: <br />3). The swaging machine may be manual, electric or pneumatic (See <br />product data). The procedure for preparation of the pipe end is the same <br />for all types. <br />4). Attach proper guide block to swage ram unit. (Not used with female <br />fittings.) <br />5). Insert draw bar through ram unit. <br />6). Carefully oil or grease the inside of the piping termination. <br />7). Insert pipe termination thread first into guide block on ram unit. <br />8). Screw swage mandrel onto draw bar and firmly against and partly <br />within the pipe termination. <br />9). Grease or oil swage mandrel to insure a smooth swage draw cycle. <br />10). Slide termination swage sleeve (silver) over termination. <br />Page 9 of 38 <br />