My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT I" 'OR MORE INFORMATION! <br />5555 Skylane Blvd., Su A / Santa Rosa, CA 95403 <br />Ph: (800) 688-3375 / Fx: (800) 700-1188 <br />www.westernfg.com <br />Co -Flow Hydrostatic Monitoring System (Sumps) <br />INSTALLATION INSTRUCTIONS <br />COMPONENT INSTALLATION: <br />1). Un -pack system components and inspect for any damaged or missing <br />parts. <br />2). Mount fluid canister to the wall of the sump, using the hardware <br />provided. It should be installed on the wall of the sump, above the fill <br />port, where it will be out of the way of any moving parts. Ensure the <br />hose at the bottom of the canister is long enough to reach the fill port. <br />3). Using Teflon tape, thread in barbed pipe fitting to FRP coupling on the <br />inside of the sump. <br />SYSTEM FILLING: <br />4). Attach pump to the fill port and fill sump until fluid starts to come out of <br />the bleeder hole. <br />5). Quickly remove the pump hose from the barbed fitting in the fill port. <br />Attach 1/4" hose between the pipe fitting and canister. <br />b). Fill the canister until fluid is just below the site glass so that when the <br />sensor is installed, the level is visible. <br />7). Allow 24-hour period for fluid level to settle. Adjust level accordingly. <br />8). Insert and install level monitor according to manufacturer's instructions. <br />SERVICE & MAINTENANCE: <br />9). Periodic inspection of monitor fluid reservoir levels and connection <br />tightness should be performed at least once per year. <br />10). If necessary, re -connect pump and re -fill as required. DO NOT <br />SUBSTITUTE OTHER FLUIDS. <br />Page 14 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.