My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTAC- 'S FOR MORE INFORMATION! <br />0tern 5555 Skylone Blvd.,, e A /Santa Rosa, CA 95403 <br />Ph: (800) 688-3375 / Fx: (800) 700-1188 <br />www.westernfg.com <br />Fiberglass UDC Transition Containment Frame <br />INSTALLATION INSTRUCTIONS <br />Please read all instructions completely prior to installation. These instructions <br />do not supersede local laws and regulations. Always comply with local <br />requirements. <br />1) Inspect Containment Frame upon receipt for any shipment damage. <br />(Please note any freight damage on the freight bill and notify Western Fiberglass <br />immediately Q 800-688-3375). <br />2) Ensure that the Containment Frame is properly sized for the existing <br />dispenser containment and the new dispenser. <br />3) Remove existing dispenser, splashguard and dispenser anchor bolts. <br />4) Install new anchor bolts as per manufacturer's installation instructions. <br />5) Ensure that the bolt pattern for the new splashguard is the same as the <br />new dispenser. Trace footprint of new splashguard to concrete. <br />6) Clean all surfaces to be sealed as per adhesive/sealant instructions. <br />7) Apply Western Fiberglass approved sealant between concrete and new <br />splashguard. Apply minimum 1/2" bead. It is strongly recommended that <br />the seam between the existing containment and existing concrete be <br />resealed. <br />8) Install new Fiberglass UDC Transition Containment Frame. <br />9) Test containment frame: <br />a. Pour water at all areas inside of new splashguard and ensure <br />water is directed toward existing containment sump. <br />b. Inspect outside of new splashguard for any signs of liquid and/or <br />moisture. <br />c. If moisture is found outside the new splashguard, identify leak <br />and repair. <br />d. Allow to cure overnight and re -test. <br />e. Remove all water from the containment sump. <br />10) Re -install dispenser. <br />Page 15 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.