My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT ` FOR MORE INFORMATION! <br />tern 5555 Skylone Blvd., S. A / Santa Rosa, CA 95403 <br />rglB55 Ph: (800) 688-3375 / Fx: (800) 700-1188 <br />www.westernfg.com <br />Transition Sump <br />INSTALLATION INSTRUCTIONS <br />Please read this manual completely prior to installation. These instructions <br />do not supersede local laws and regulations. Always comply with local <br />requirements. <br />1). Inspect Containment Box upon receipt for any shipment damage. <br />2). Locate and install piping, conduit and service penetration fittings as <br />needed. Follow penetration manufacturer's instructions as required. <br />4). Install piping, maintaining proper fall/entry angles. Test piping and <br />penetrations as instructed by local and regional regulations and <br />manufacturers instructions. <br />SUMP REDUCERS & LIDS: <br />To prevent leakage and to insure unit integrity, all FRP sump reducers must <br />be slip fitted over the sump body, bonded and sealed (See Bonding <br />Instructions below). <br />C� 'TC" RIpCFION <br />TYPE "A" <br />TWE Wr <br />TWIST AND SEAL <br />T. C. or Friction fit lids simply slip <br />over the reducer top. "B" type, <br />water resistant, lid systems utilize <br />pull down "dog" or tie down to <br />hold the lid securely against the <br />sealing gasket on the reducer rim. <br />"A" type lid systems are gasketed <br />and bolted watertight with wing <br />nuts, lock and flat washers. <br />TWIST -SEAL LID: <br />1. After sump(s) have been installed on site and <br />all work inside has been completed, inspect <br />the gasket in the lid to make sure it is free of <br />damage or debris. Also make sure the surface <br />of the reducer where the gasket will come in <br />contact is clean and smooth. Lubricate the gasket with supplied <br />grease. <br />Pdge 33 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.