My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT I" cOR MORE INFORMATION! <br />Abidw 5555 Skylane Blvd., SL A / Santa Rosa, CA 95403 <br />Ph: (800) 688-3375 / Fx: (800) 700-1188 <br />www.westemfg.com <br />b. Observe water level for a minimum of 3 hours. <br />c. Water level shall not decrease more than allowable for normal <br />evaporation. <br />2) a. Fill interstitial space of sump within 4 to 6 inches of top. <br />b. Observe water level. <br />c. Water level shall not decrease more than allowable for normal <br />evaporation. <br />Interstitial space shall be tested by vacuum (5 bars) or pressure (2 psi) for a <br />minimum of 10 minutes. <br />BACKFILL REQUIREMENTS: <br />Sufficient backfill must be used below and along the sump side to provide <br />support and protection against ground movement. <br />TEST PROCEDURES FOR SINGLE WALL: <br />After the sump to tank fitting is completed, you shall test the integrity of your <br />seal. This is important to insure that the sump riser tube / tank bond will not <br />allow any contained fluid to leak. Check with local regulations for required <br />testing procedures. A common test procedure is to fill the sump with water <br />after the sump / tank bond has completely cured, usually overnight, and <br />observe bond seam for any leaks. <br />PLEASE NOTE: U.L. Listed sumps require a listed, approved, electronic <br />monitor/alarm system to be installed for operator notification in the event of <br />product leakage within sump area. <br />TEST PROCEDURES FOR DOUBLE WALL: <br />After completion of the sump body test as described above, you may test <br />the sump body interstitial space by applying no more than 2 psi to the port(s) <br />installed within the sump body. The annular space may also be tested using <br />liquid or vacuum. For test times or other requirements, always follow local <br />regulations and restrictions. <br />PLEASE NOTE: U.L. Listed sumps require a listed, approved, electronic <br />monitor/alarm system to be installed for operator notification in the event of <br />product leakage within sump area. <br />Page 32 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.