Laserfiche WebLink
Smith Environmental SITE SAFETY PLAN <br /> Job Name: BJJ Trucking,Inc. <br /> Job Location: 757 East 11th Street,Tracy, California <br /> Client Name: BJJ Trucking,Inc. <br /> Project Number: 96731 <br /> General Work Description: Subsurface Investigation <br /> SSP Prepared by: Drew Van Allen <br /> On-site Safety Officer: William Madison <br /> Project Safety Officer. Tom L Lutterman <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site <br />. employees during all phases of site operations. The SSP must be reviewed and signed by all on- <br /> site employees, subcontractors, and visitors prior to entering the site. General safe work <br /> practices are identified in the Smith Environmental Technologies Corporation's Injury and <br /> Illness Prevention Manual and apply to all Smith Environmental work sites. <br /> The provisions set-forth in this SSP shall apply to Smith Environmental employees and any <br /> subcontractors working for Smith Environmental at the job site. All personnel working for <br /> Smith Environmental at the job site must read this SSP, and sign the attached Compliance <br /> Agreement before entering the work area. Field personnel may deviate from the safety <br /> provisions set-forth in this SSP, but only to upgrade or increase the safety requirements. Smith <br /> Environmental personnel may suspend work if unsafe working conditions are identified or <br /> observed, or unauthorized modifications to the safety provisions set-forth in this SSP are made. <br /> If changes in site or working conditions require changes in safety procedures, appropriate <br /> amendments to this SSP will be provided by the Smith Environmental project manager or <br /> supervisor, with the written approval of a Smith Environmental project safety officer or the <br /> Smith Environmental Health and Safety Director. <br /> PACE 2 <br />