Laserfiche WebLink
i <br /> F <br /> waterWark <br /> Quality Assurance and Quality Control Plan <br /> The Remedial Investigation (RI ) Quality Assurance/Quality Control <br /> (QA/QC) program is intended to facilitate the acquisition of <br /> accurate and reliable data. Environmental data gathered during <br /> the RI will be collected and analyzed following procedures j <br /> prescribed in the Quality Control Program. A Quality Assurance f <br /> Program has been established to assure that the Quality Control <br /> a Program is effective. Both programs are necessary to provide <br /> accurate data and documentation for investigations and laboratory <br /> analyses. The following field and laboratory procedures will be <br /> implemented to ensure that QA/QC objectives are met. , <br /> n <br /> 1.0 Field QA/QC Plan <br /> The Field QA/QC Plan includes protocols fox ! <br /> 64 <br /> - Data Collection <br /> s <br /> - Equipment Decontamination <br /> - Soil Sampling <br /> } <br /> Groundwater sampling <br /> - Groundwater monitoring j <br /> Well development <br /> The following descriptions are general summaries of the <br /> QA/QC procedures for field activities. <br /> Detailed sampling procedures are described in the attached <br /> protocols. This section presents sampling procedures <br /> relating to QA objectives. <br /> Y <br /> All information pe-'ciner:t to the field investigation will be <br /> kept in a field log book. Information to be documented <br /> includes at lv_ast the following; <br /> - Sample n+ambers <br /> Locations of sample collection : <br /> Soil boring or well numbers, as applicable <br /> Depths at which samples were obtained <br /> 1 <br />'f I <br /> i <br />