Laserfiche WebLink
Names of collectors <br /> Dates and times of collection <br /> Purpose of sample <br /> - Sample distribution (e.g. , laboratory, archive, etc. ) <br /> Field observations <br /> i <br /> Field measurements (e.g. , PID readings, pH, <br /> conductivity, water levels) . <br /> - Other data records (e.g. development log, soil sampling <br /> report, well log, etc. ) <br /> Procedures for surface soil collection from shallow test <br /> pits are discussed in the appended Soil Sampling Protocol. <br /> ,�. Soil samples will be collected using decontaminated <br /> equipment and placed in laboratory prepared containers. <br /> All drilling equipment, pipe, and materials coming in <br /> contact with the borehole material will be decontaminated <br /> t before use according to the procedures described in Section <br /> S.O. All sampling equipment will be decontaminated prior to <br /> *- sampling following these same procedures. <br /> Soil samples will be collected as monitoring well drilling <br /> progresses. All downhole drilling equipment will be <br /> decontaminated prior to use and between use for each well <br /> according to the procedures described in Section 6.0. <br /> All well construction material, including well casing, <br /> - screen, and well caps, will be decontaminated prior to <br /> installation by steam cleaning according to the procedures <br /> described in Section 6.0. <br /> I � <br /> To prevent the transfer of surface contamination to a well, <br /> a Portland cement and bentonite surface seal will be <br /> installed in conformance with recgulitory requirements. The <br /> casing will be fitted with a water tight locking cap. No <br /> solvent or glue will he used in well construction. The <br /> wellhead will be contained below grade in a water-tight <br /> traffic rated box or otherwise protected from damage. <br /> In order to assure that groundwater samples ure obtained <br /> from formation material and not from the filter pack, wells <br /> will be purged in accordance with the appended <br /> Well Development Protocol. <br /> - Samples will be placed in laboratory prepared containers, <br /> appropriate for the analyses specified as indicated on Table <br /> 1. <br /> i <br />