My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
3500 - Local Oversight Program
>
PR0544463
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:50 AM
Creation date
5/16/2019 8:42:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544463
PE
3528
FACILITY_ID
FA0003214
FACILITY_NAME
EASTGATE BUSINESS PARK*
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY. 13. 1998 10: 16AM HEINZ PGH 134. 8194 P. 2/3 <br /> r <br /> Heinz U.S.A. Div-won 01 H.J.Hein"CompBnY <br /> 1062 FrogrPq%SIMe1 <br /> PlnsbuOn 4 15212,5990 237657 <br /> Telephone:a12 237 5757 <br /> May 13, 1998 <br /> Mr.Harlin knoll <br /> San Joaquin County Public Health Services <br /> Envirosunental Health Division <br /> P.O.Box 388 <br /> Stockton,CA 95201-0388 <br /> Dear Mr.Knoll: <br /> Thank you for meeting with us on April 30 to review the fuel tank remediation project at our Tracy factory <br /> site. The project involved removal and disposal sal of two tanks,removal of contaminated soil,treatment of <br /> e <br /> eonwninated groundwater,replacement of soil,and installation of monitoring wells. Pursuant to our <br /> discussions,this latter will summarize the meeting,review subsequent activities,and request a conditional <br /> "No Further Action"letter from your agency. <br /> During the meding,the remaining pmject requirements were,outlined as follows: <br /> 1. A project contact for Heinz USA.is required following the closure of the plant offices at Tracy. <br /> 2. Additional soil removal and testing would be required from the No. 1(West)tank excavation. It <br /> was agreed that no further soil removal from either excavation would be required beyond that <br /> is .n 1 ` O � Al <br /> Maihnw Mt rJ -,-% PO[snx yi Pdl.nuigh. Rennsvivsnia 15230 003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.