Laserfiche WebLink
Mr Harlin Knoll Environmental <br /> 11 August 2000 Resources <br /> rage 3 Management <br /> I <br /> • <br /> A second round of ground water samples will be collected from all wells <br /> at the site three months after the initial sampling event The samples will <br /> be analyzed for the same compounds list above <br /> REPORTING <br /> Following completion of the monitoring well installation, development, <br /> and sampling, a brief letter report summarizing the monitoring well <br /> installation activities and the ground water sampling results will be <br /> prepared and subnutted to the County This report will include a <br /> comparison of the ground water sampling results to the results of <br /> previous samples collected at each former tank site A similar letter <br /> report will be prepared following the second round of ground water <br /> sampling <br /> SCHEDULE FOR PROPOSED WORK <br /> . Upon approval, ERM will commence the proposed scope of work <br /> outlined above ERM anticipates that written County approval can be <br /> obtained within 2 weeks following submittal of the workplan ERM <br /> anticipates that the field work can begin within 2 weeks following receipt <br /> of County approval <br /> A written approval of this workplan is requested If you have any <br /> questions about the proposed scope of work, please call me at (925) 946- <br /> 0455 <br /> Sincerely, <br /> Matthew L Brandy, P E <br /> Project Manager <br /> MXB/mxb/3374 <br /> cc Scott Krall (Heinz) <br /> • Marty Hartzel (RWQCB) <br /> James Devenport (Cranbrook) <br />