Laserfiche WebLink
SECTION 5 <br /> ANTICIPATED IMPLEMENTATION SCHEDULE <br /> This section discusses the proposed project schedule for excavation <br /> activities at the Site The schedule highlights all of the major tasks <br /> required to complete the construction, beginning with workplan approval <br /> Major summary tasks included on the schedule are <br /> • Approval of workplan, <br /> • Acquisition of required permits, <br /> • Field activities, and <br /> • Report on completion of remediation <br /> It is anticipated that SJC approval of the workplan will be obtained two <br /> weeks after the plan has been submitted Permit acquisition will be <br /> underway simultaneously with the workplan approval process, and is <br /> expected to be complete concurrent with workplan approval Once <br /> permitting approval has been received, one week is anticipated for <br /> complete mobilization As currently planned, the duration of excavation, <br /> treatment and backfill activities will be approximately four weeks and will <br /> begin after SJC approval of the workplan A Closure Report will be <br /> completed and transmitted to the SJC four weeks after field activities are <br /> complete As the project progresses, this schedule will be updated if <br /> necessary Table 5-1 summarizes the project schedule and the proposed <br /> target dates <br /> The following major assumptions have been made in estimating the <br /> remediation schedule <br /> • SJC workplan approval and excavation permits, will be received in a <br /> timely fashion, <br /> • The excavation will be done with the labor and equipment as outlined <br /> in the project description section, <br /> • Weather conditions during the field activities will allow for full-time <br /> operation, and <br /> • Turnaround time for analysis of confirmation samples is 24 hours <br /> 5-1 <br />