My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010185
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
3500 - Local Oversight Program
>
PR0544463
>
ARCHIVED REPORTS XR0010185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:05 AM
Creation date
5/16/2019 9:04:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010185
RECORD_ID
PR0544463
PE
3528
FACILITY_ID
FA0003214
FACILITY_NAME
EASTGATE BUSINESS PARK*
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 5 <br /> ANTICIPATED IMPLEMENTATION SCHEDULE <br /> This section discusses the proposed project schedule for excavation <br /> activities at the Site The schedule highlights all of the major tasks <br /> required to complete the construction, beginning with workplan approval <br /> Major summary tasks included on the schedule are <br /> • Approval of workplan, <br /> • Acquisition of required permits, <br /> • Field activities, and <br /> • Report on completion of remediation <br /> It is anticipated that SJC approval of the workplan will be obtained two <br /> weeks after the plan has been submitted Permit acquisition will be <br /> underway simultaneously with the workplan approval process, and is <br /> expected to be complete concurrent with workplan approval Once <br /> permitting approval has been received, one week is anticipated for <br /> complete mobilization As currently planned, the duration of excavation, <br /> treatment and backfill activities will be approximately four weeks and will <br /> begin after SJC approval of the workplan A Closure Report will be <br /> completed and transmitted to the SJC four weeks after field activities are <br /> complete As the project progresses, this schedule will be updated if <br /> necessary Table 5-1 summarizes the project schedule and the proposed <br /> target dates <br /> The following major assumptions have been made in estimating the <br /> remediation schedule <br /> • SJC workplan approval and excavation permits, will be received in a <br /> timely fashion, <br /> • The excavation will be done with the labor and equipment as outlined <br /> in the project description section, <br /> • Weather conditions during the field activities will allow for full-time <br /> operation, and <br /> • Turnaround time for analysis of confirmation samples is 24 hours <br /> 5-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.