My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010185
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
3500 - Local Oversight Program
>
PR0544463
>
ARCHIVED REPORTS XR0010185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:05 AM
Creation date
5/16/2019 9:04:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010185
RECORD_ID
PR0544463
PE
3528
FACILITY_ID
FA0003214
FACILITY_NAME
EASTGATE BUSINESS PARK*
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br /> Proposed work at the Heinz facility consists of the removal and disposal <br /> of two underground storage tanks including the tank contents, removal <br /> and disposal of impacted soils in the vicinity of each tank, removal and <br /> disposal of impacted groundwater in the vicinity of each tank, backfill or <br /> excavations with clean overburden and imported backfill and surface <br /> restoration and repaving as required <br /> This workplan is divided into four sections Section 2 presents a summary <br /> of the soil and groundwater investigation results acquired during the <br /> Phase I and Phase II environmental site assessments Section 3 describes <br /> the sequence of events and excavation activities proposed for removal of <br /> the tanks and remediation of impacted soil and ground water Section 4 <br /> contains the soil and ground water sampling plan that will be used <br /> throughout the excavation process and Section 5 presents the anticipated <br /> schedule for accomplishment of the work <br /> 1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.