Laserfiche WebLink
10 <br /> TABLE OF CONTENTS <br /> K <br />' 10 Introduction 3 <br /> 1 1 Site Location and Description 3 <br />' 1 2 Previous Work 3 <br /> 1 2 1 UST System Removal and One Sod Boring 3 <br /> 1 2 2 Preliminary Investigation and Evaluation 4 <br />' 1 2 3 Cone Penetration Testing and Discrete Groundwater Sampling 4 <br /> 1 2 4 Installation of Off-Site Monitoring Wells and Sensitive Receptor Survey 6 <br /> 2 0 Groundwater Monitoring, Sampling and Analysis 7 <br /> 2 1 Groundwater Monitoring 7 <br /> 2 2 Groundwater Sampling and Analysis 7 <br />' 3 0 Conclusions, Recommendations and Project Status 8 <br />' LIST OF TABLES <br /> Table Title <br /> 1 Well Construction and Cumulative Groundwater Monitoring Data <br /> 10 2 Cumulative Analytical Results— Groundwater <br /> LIST OF FIGURES <br /> Figure Title <br /> 1 Site Location Map <br /> 2 Site Plan <br />' 3 Site Vicinity Map <br /> 4 Groundwater Surface Map (February 19, 2003) <br />' 5 Concentration of TPH-Gasoline and Benzene at Groundwater Table <br /> LIST OF APPENDICES <br /> 1 <br /> Appendix Title <br /> A Laboratory Reports <br /> 0' <br />