My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001515
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1419
>
3500 - Local Oversight Program
>
PR0544465
>
ARCHIVED REPORTS XR0001515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 1:32:36 PM
Creation date
5/16/2019 1:04:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001515
RECORD_ID
PR0544465
PE
3528
FACILITY_ID
FA0005837
FACILITY_NAME
STEFANOS GASOLINE*
STREET_NUMBER
1419
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15137016
CURRENT_STATUS
02
SITE_LOCATION
1419 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 Monitoring Well Installations <br /> ' On September 26 and 28, 2001, under the supervision of Ramage Environmental, V&W Drilling, <br /> Inc (C-57 License#720904) installed four off-site groundwater table monitoring wells, to define <br /> the lateral extent of impacted groundwater and to expand the"groundwater monitoring capability at <br /> the site The locations of the four wells, designated MW-4, MW-5, MW-6 and MW-7, are shown <br /> ' on Figure 3 <br /> 2 3 1 Monitorinq Well Construction Development and Elevation Surve <br />' V&W Drilling installed all four wells in 8-inch diameter soil s borings drilled to depths of 50 feet b <br /> g P g <br /> using a truck-mounted, hollow-stem auger drilling rig Each of the four wells consisted of 20 feet <br /> of two-inch diameter, Schedule 40, flush-threaded and machine-slotted (0 020-inch) polyvinyl <br /> chloride (PVC) well screen, spanning from approximately 30 to 50 feet bgs Blank PVC casings <br />' were threaded into the tops of the well screens and extended to the surface <br />' In each well, a filter pack of#2112 graded and washed silica sand was placed through the hollow <br /> stem augers as they were slowly retrieved and until the sand packs reached approximately two <br /> feet above the tops of the screened intervals Following the placement of the sand packs, the <br /> poll driller developed each of the wells by the surge and purge method Each of the wells was surged <br /> for approximately 5 minutes using a wire-line surge block system Between surging cycles, <br /> approximately 5 gallons of groundwater were bailed from each well Following well development, <br /> two feet of hydrated bentonite chips were placed within the annular spaces between the boreholes <br /> and the well casings Surface seals of 20 1 cement bentonite neat grout were placed over the <br /> hydrated bentonite, under PHSIEHD observation The tops of the wells were secured with water- <br /> tight locking caps and 8-inch diameter, traffic-rated utility boxes <br /> iDuring October 2001, Morrow Surveying (California Licensed Land Surveyor#5161) surveyed the <br /> newly-installed wellheads, and re-surveyed the three existing monitoring wells Morrow Surveying <br />' located the wells and measured the elevations of the tops of the well casings to the nearest 0 01 <br /> foot, referenced to City of Stockton Benchmark#183 The benchmark is a brass disc in a <br />' monument box at the intersection of the west side of Airport Way and the centerline of Charter - <br /> Way (Elevation 17 132 feet above mean sea level) The surveyor's report is included as <br /> Appendix C <br /> . 10 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.