My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001515
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1419
>
3500 - Local Oversight Program
>
PR0544465
>
ARCHIVED REPORTS XR0001515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 1:32:36 PM
Creation date
5/16/2019 1:04:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001515
RECORD_ID
PR0544465
PE
3528
FACILITY_ID
FA0005837
FACILITY_NAME
STEFANOS GASOLINE*
STREET_NUMBER
1419
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15137016
CURRENT_STATUS
02
SITE_LOCATION
1419 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 SCOPE OF WORK <br /> ' The objectives of this phase of environmental corrective action were as follows <br /> • Evaluate if the plume of impacted groundwater threatens any potential sensitive receptors, <br /> • Define the lateral extent of impacted soil and groundwater, and <br /> • Expand the groundwater monitoring capability at the site <br /> To achieve these project objectives, Ramage Environmental <br /> • Surveyed sensitive receptors within 2,000-feet of the site, <br /> • Supervised the installation of four off-site groundwater monitoring wells, and <br /> • Monitored and sample the expanded groundwater monitoring well network <br />' 21 Planning and Permitting <br /> Prior to initiating fieldwork, a site-specific health and safety plan addendum was prepared <br /> according to 29 CFR 1910 120 The health and safety plan included safety procedures, chemical <br /> hazard information, site safety officers, and preferred medical emergency locations <br /> To perform the required work, drilling permits were obtained from PHSIEHD Since two of the <br /> monitoring wells were installed within the Sierra Nevada Street right-of-way, an encroachment <br /> permit was obtained from the city of Stockton Since two of the monitoring wells were installed on <br /> the San Joaquin County Fairgrounds, an access agreement was obtained from 2nd District <br /> Agricultural Association, San Joaquin County Fair Copies of the approved permits and access <br /> agreement are included in Appendix A <br /> tAs required by the permits, PHSIEHD the city of Stockton and the San Joaquin County Fair were <br /> notified to schedule construction and regulatory inspections Underground Service Alert (USA) <br /> was also notified so that member utilities could mark their underground facilities, under USA <br /> Ticket#291625 <br /> 8 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.