Laserfiche WebLink
HPF' U4 '8F; 1 3: 05 E;<CELTEC" <br />' 1 <br />TABLE OF CONTENTS <br />INTRODUCTION <br />SECTION 1.0 <br />TECHNICAL APPROACH <br />SECTION 2.0 <br />SCOPE OF WORK <br />SECTION 3.0 <br />Phase I <br />Task 1 <br />Groundwater Quality Sampling <br />Task 2 <br />Laboratory Analysis <br />Task 3 <br />Analytical Report and Recommendations <br />Phase 2 <br />Task 4 <br />Exploratory Drilling <br />Task 5 <br />Ground Water Quality Monitoring Well Installation <br />Task 6 <br />Well Development <br />Task 7 <br />Ground Water Quality Sampling <br />Task 8 <br />Laboratory Analyses <br />Task 9 <br />Conduct Slug Tests and Determine Hydraulic Conductivlty <br />Task 10 <br />Surveying <br />Task 11 <br />Contamination Assessment Report <br />Phase 3 <br />Task 12 <br />Hydrocarbon Abatement Alternatives Report <br />Task 13 <br />Prepare Remedial Action Plan <br />Phase 4 <br />Task 14 <br />Implement Remedial Action Plan <br />Task 15 <br />Removal of Contaminated Soil <br />PROJECT COSTS SECTION 4.0 <br />TERMS AND CONDITIONS SECTION 5.0 <br />