Laserfiche WebLink
j <br />March 16, 1988 <br />Roberts Oil Company <br />Page 5 <br />area is not feasible, due to the absence of ground water quality monitoring <br />wells, and soil boreholes, upgradient and downgradient from the transfer <br />block/loading area. <br />SECTION 2.0 <br />1111144JUNKAW.-M, 08 <br />The technical approach proposed by Exceltech is divided into four phases. <br />Phase One will involve conducting a ground water quality monitoring and <br />sampling effort on the existing facility's ground water quality monitoring <br />network, with the objective of generating recommendations for concluding <br />the facility's contamination assessment activities. Phase Two will involve <br />implementing the recommendations generated under Phase One, to conclude <br />the facility's contamination assessment activities. Phase Three will <br />involve developing a remedial action plan which will eliminate or abate the <br />contamination occuring beneath the facility. The remedial action plan <br />developed will meet with the approval of applicable regulatory authorities. <br />Phase Four will involve implementing the remedial action plan, <br />SECTION 3.0 <br />PHASE 1 <br />Task 1: GroundW_algr Quality Saml2linq <br />Ground water quality samples will be collected from the existing ground <br />water quality monitoring well network onsite. Ground waver samples will be <br />