My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1805
>
2900 - Site Mitigation Program
>
PR0544467
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:17:17 PM
Creation date
5/16/2019 4:09:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544467
PE
2959
FACILITY_ID
FA0009741
FACILITY_NAME
EL DORADO CHEMICAL CO INC
STREET_NUMBER
1805
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15514007
CURRENT_STATUS
02
SITE_LOCATION
1805 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Larry McGowan -2- July 6, 1987 <br /> III-A <br /> o Describe the diameter, length, composition and method of <br /> joint sealing for the pipe transporting waste from the plant <br /> to the waste storage tank. <br /> III-B <br /> o What OSHA standard is being referenced? <br /> o How and where does neutralization occur? <br /> o What chemicals are used to clean the mix and storage tanks? <br /> o What is the estimated volume of wastewater? <br /> o What is the estimated volume of sludge? <br /> o Submit several recent laboratory analysis of the wastewater. <br /> III-C <br /> o Regulations require a bi-lingual sign. <br /> IV-B <br /> o What criteria will be used for selecting approved fill <br /> material? What required placement and compaction procedures <br /> are being referenced? <br /> o Provide the name and location of disposal facilities which <br /> will be used for disposal of the tank and contaminated soil. <br /> o Closure procedure is unclear. You are required to <br /> completely remove the steel and concrete tank and all waste <br /> lines leading to the tarik including the waste collection <br /> lines in the formulation building. <br /> o Describe construction equipment decontamination procedures <br /> and procedures for containment and disposal of waste <br /> materials generated during decontamination. <br /> V-A <br /> o Notify the Department and the CVRWQCB at least 7 working <br /> days prior to the start of closure. <br /> o Describe procedures for testing and visually inspecting the <br /> wastewater tank after cleaning but prior to removal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.