My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1805
>
2900 - Site Mitigation Program
>
PR0544467
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:17:17 PM
Creation date
5/16/2019 4:09:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544467
PE
2959
FACILITY_ID
FA0009741
FACILITY_NAME
EL DORADO CHEMICAL CO INC
STREET_NUMBER
1805
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15514007
CURRENT_STATUS
02
SITE_LOCATION
1805 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Larry McGowan -3- July 6, 1987 <br /> o Describe procedures for testing the pipe that transports <br /> waste from the plant to the wastewater tank. What are the <br /> plans for closing this line? •.If testing indicates the line <br /> has leaked, how will clean up be accomplished? <br /> V-A-Step 2-4 <br /> o Describe procedures and equipment to be employed to protect <br /> personnel during closure activities (e.g. vapor monitoring, <br /> personal protective equipment) . <br /> V-A-Step 2-5 <br /> o What parameters will the water from the third rinse be <br /> analyzed for? <br /> o What are background levels? <br /> V-A-Step 3-1 <br /> o How far from the tank are the proposed borings? <br /> o Be more specific about depth of soil borings and depths <br /> where samples will be collected. <br /> o How will samples be collected from beneath the tank? <br /> Describe the procedure you will use to gather undisturbed <br /> samples from beneath the tank. <br /> o Four shallow soil borings are inadequate to characterize <br /> potential tank overflow and/or leakage. Please describe the <br /> rationale for selecting sample locations and depths, the <br /> number of samples to be collected and the parameters to be <br /> analyzed for. <br /> V-A-Step 3-3 <br /> o I£ phenols or chlorinated phenols are found through <br /> qualitative analysis (EPA 8020) then confirm with GC/MS or <br /> GC/MSD. <br /> o Test for fluorides. <br /> V-A-Step 4 <br /> 0 Is tank being removed or filled in? Tank must be removed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.