Laserfiche WebLink
Scoae: <br /> The vast majority of the bores will be inside the buildings and the drilling rig. We anticipated to <br /> use the Geoprobe 66 and 77 series track rig. Precision Sampling will be the driller. <br /> After sample cores are obtained, they will be chilled on ice and shipped to a state certified lab <br /> for analyses. The bore will be backfilled with hydrated bentonite and resurfaced. The bores are <br /> not expected to reach local ground waters. <br /> Additional Assumptions: <br /> 1. Fieldwork will take around 3 working days. <br /> 2. Drums for waste storage are provided at and will be store temporarily on SITE until <br /> disposal. <br /> 3. Tenants shall be kept at safe distance at the time of fieldwork. <br /> 4. Drilling contractor shall be a full-service major drilling contractor, with on-staff health and <br /> safety officer. <br /> Work schedule: <br /> 1. Starting date: to be scheduled as soon as possible after signing the contract (tentatively <br /> 7/11/2007-7/1312007). <br /> 2. Lab results and report: about 2 calendar weeks after last day of the fieldwork. <br /> We appreciate very much this opportunity to be of help on this project, and please feel free to <br /> call if you have any questions. <br /> Sincerely, <br /> GEO,O <br /> �5 O <br /> O <br /> c CHH HUANG <br /> • No.5724 <br /> to <br /> 9rFOF Oq�\FOS <br /> Dr. C. Huang <br /> Registered Professional Geologist, State of California <br /> Environmental,Engineering, &Real Estate Transaction Consultants <br /> Charter-SJCounty-Workplan Page 2 <br />