Laserfiche WebLink
I <br /> Ms. Margaret Lagorio, R.E.H.S. <br /> March 6, 1995 - <br /> Page 2 <br /> construction debris.. Based upon discussions with Mr. Mike Collins from SJCPHS, it will <br /> not be necessary to contain the small amount of water. (approximately one gallon) that will t <br /> be discharged from each well during abandonment. Laboratory analyses of groundwater I <br /> samples taken from the wells have not shown the:presence of chemicals in the last three <br /> successive sampling events (January 1992, April 1992, and July 1992). SJCPHS inspection <br /> I <br /> of the abandonment will assure compliance with all requirements. <br /> Closure <br /> i <br /> McLaren/Hart can schedule the completion of well abandonment activities on a date that <br />` will accommodate SJCPHS staff agendas. Upon issuance of a well abandonment permit, <br /> we will contact SJCPHS to schedule the abandonment. If you have any questions regarding t <br /> the proposed scope to work, please call me at (916) 638-M96. <br /> 1 <br /> Sincerely, <br /> G <br /> ames Obereiner 1J.aq=eyn Huse, C.E.G. #1404 <br /> Senior Associate Geoscientist Supervising Geoscientist <br /> jh/ry <br /> Attachment ` <br /> Enclosure (Well Destruction Permit and $60.00 Permit Fee) <br /> i <br /> rc955038:NwHo11\01.0013217.000 <br /> 3.6.95 <br /> V Lan <br /> ENVIRONMENTAL ENGINEERING CORPORATION <br />